Key Features
Major Reference
UMM SHAIF GAS CAP PROJECT
<ONGOING>
A major gas development project aimed at unlocking the gas resources of the Umm Shaif offshore field. The project is expected to deliver more than 600 million standard cubic feet per day of natural gas and associated gas liquids, with production targeted from 2030.
SITE
Umm Shaif Offshore Field, Abu Dhabi, UAE
VALUE
USD 6.2 Billion
EPC
Larsen & Toubro
(India)
YEAR
2026–2030
PETROSOUK INC. SCOPE
Ongoing
UMM SHAIF OFFSHORE FACILITIES PROJECT
<ONGOING>
A major offshore development package awarded by ADNOC Offshore to a consortium led by Larsen & Toubro. The project covers the engineering, procurement, construction, installation and commissioning of multiple offshore facilities, together with upgrades to existing offshore infrastructure.
SITE
Umm Shaif Offshore Field, Abu Dhabi, UAE
VALUE
USD Multi Billion
EPC
Larsen & Toubro
(India)
YEAR
2026–2030
PETROSOUK INC. SCOPE
Ongoing
NGL-5 PROJECT
<ONGOING>
A major natural gas liquids processing project at QatarEnergy’s Mesaieed complex. The NGL-5 facility is designed to process up to 350 million standard cubic feet per day of rich associated gas from QatarEnergy’s offshore and onshore fields. The project includes a new NGL processing plant and associated utilities, offsites and integration facilities, producing sales gas, ethane, propane, butane and hydrocarbon condensate.
SITE
Mesaieed Industrial City, Qatar
VALUE
USD 2.5 Billion
EPC
Larsen & Toubro
(India)
YEAR
2025–2028
PETROSOUK INC. SCOPE
Equipment / Instrument
(Ongoing)
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) / COMP4 PROJECT
A major offshore gas compression project developed as part of QatarEnergy LNG’s North Field Production Sustainability program. The project includes the engineering, procurement, fabrication, installation and commissioning of two offshore compression complexes, each incorporating compression and power generation facilities, living quarters, flare platforms and interconnected bridges. The facilities are located approximately 80 km offshore from the northeast coast of Qatar.
SITE
North Filed Offshore, Qatar
VALUE
USD 5 Billion
EPC
Larsen & Toubro
(India)
YEAR
2025–2029
PETROSOUK INC. SCOPE
Piping
BALTIC GAS CHEMICAL COMPLEX PROJECT
An ultra-large-scale gas chemical complex under development near Ust-Luga, Russia, designed for the deep processing of ethane-rich natural gas. The project includes large-scale ethane cracking and polymer production facilities, with the ethane cracker designed for approximately 2.8 million tonnes per year of ethylene production. The complex forms part of the broader gas processing and chemical cluster in the Ust-Luga area.
SITE
Ust-Luga, Leningrad Region, Russia
VALUE
USD 20 Billion
EPC
China National Chemical Engineering & Construction Corporation Seven (CC7)
(China)
YEAR
2020–2027
PETROSOUK INC. SCOPE
Equipment / Piping
DELAYED COKING UNIT / OMSK REFINERY PROJECT
A major modernization project at the Omsk Refinery involving the development of a new Delayed Coking Unit (DCU). The facility was designed to improve the conversion of heavy oil residues, increase the production of high-value light petroleum products and enhance overall refining efficiency. The new DCU has a processing capacity of approximately 2 million tonnes per year.
SITE
Omsk, Russia
VALUE
USD 1 Billion
EPC
DL E&C
(Korea)
YEAR
2016–2020
PETROSOUK INC. SCOPE
Equipment